Sub Meter Installation

Installing a sub meter involves electrical work and should only be done by a licensed electrician. However, here are some general steps involved in installing a sub meter:

  1. Determine the location: Choose a location for the sub meter near the electrical panel where the main service enters the building. The sub meter should be mounted securely to the wall.

  2. Turn off the power: Before you begin, turn off the power to the circuit you'll be working on. You can do this by switching off the circuit breaker or removing the fuse.

  3. Install a junction box: Install a junction box near the sub meter to protect the electrical wires.

  4. Install a conduit: Install a conduit from the main electrical panel to the junction box, following local codes and regulations.

  5. Run wires: Run wires from the main electrical panel to the junction box and connect them to the sub meter, following the manufacturer's instructions.

  6. Connect the wires: Connect the wires from the main electrical panel to the sub meter, following the manufacturer's instructions.

  7. Turn on the power: Once you're done, turn the power back on and test the sub meter to ensure it's working correctly.

It's important to note that sub meter installation can vary depending on the specific model and requirements. Additionally, electrical work can be dangerous and should only be done by a licensed electrician. If you're unsure about any aspect of the process, or if you're not comfortable working with electricity, it may be best to hire a professional from Locals4u for assistance.